| Theoretical Study on Absorption Heat Transformer Coupled with KCS34 System |
Dai, Bingjie; Fu, Wencheng |
Power plant design and operation; Equipment design; Heat tra |
Kalina cycle; absorption heat transformer; ammonia-water mixture; net power output; thermal efficiency |
Geothermal Resources Council Transactions |
2014 |
English |
| An Introduction to Flow Control Devices and the Potential Benefits to Geothermal Applications |
Curkan, Brandon; DePencier, Jami; Klaczek, Wayne |
Power plant design and operation; Equipment design; Flow con |
Flow Control Devices, FCDs, Outflow Control Devices, OCDs, Inflow Control Devices, ICDs, Thermal Enhanced Oil Recovery, Steam Assisted Gravity Drainage, SAGD, Enhanced Geothermal Systems, EGS, Full-Scale Flow Loop, Production Optimization |
Geothermal Resources Council Transactions |
2019 |
English |
| Production Well Automation Upgrades for Increased Reliability |
Rochford, Rich |
Power plant design and operation; Equipment design; Emergenc |
Geothermal, Power Plant, Production Well, ESV, Flow Control |
Geothermal Resources Council Transactions |
2022 |
English |
| Heat-to-Electricity with High-Speed Magnetic Bearing/Generator System |
Hawkins, Lawrence; Lei Zhu; Blumber, Eric; Mirmobin, Parsa; Erdlac, Richard, Jr. |
Power plant design and operation; Equipment design; Electric |
ORC; coproduced geothermal; active magnetic bearings; permanent magnet generator; high speed; waste heat recovery; low temperature; oil/gas; R245fa; 125 kW generator; Calnetix; Access Energy |
Geothermal Resources Council Transactions |
2012 |
English |
| Field Test of Thermoelectric Generators at Bottle RockGeothermal Power Plant |
Li, Kewen; Garrison, Geoffrey; Moore, Michael; Zhu, Yuhao; Liu, Changwei; Hepper, Jay; Bandt, Larry; Horne, Roland; Petty, Susan |
Power plant design and operation; Equipment design; Electric |
thermoelectric generator system, direct power generation, thermoelectric effect, thermal efficiency |
Geothermal Resources Council Transactions |
2020 |
English |
| Enabling Geothermal Energy Growth with Electric Submersible Pumps at 225 degC |
Vasilache, Liliana Cristina; Radov, Maxim; Lovekin, James |
Power plant design and operation; Equipment design; Electric |
Electric submersible pumps, ESPs, pressure-depleted fields, enhanced geothermal systems, EGS, deviated wells, scale inhibition, vapor fractions, run times |
Geothermal Resources Council Transactions |
2021 |
English |
| Calpine Geysers? Units 18 and 20?s Stretford System Froth and Balance Tank Level Measurement |
Derenia, Anthony; Ershen, Cathy; Carroll, Pat |
Power plant design and operation; Equipment design; Effluent |
Stretford abatement system; H2S abatement; froth tank; balance tank; level measurement; non-contacting radar; bubbler; air emissions control equipment |
Geothermal Resources Council Transactions |
2013 |
English |
| Performance Improvement of Geysers Power Plant Units 9 & 10 |
Rossknecht, Libby |
Power plant design and operation; Equipment design |
Power Generation; USA; California; Sonoma; Geysers; Case Histories; H2S Abatement; Hydrogen Sulfide; Cooling Towers; Condensers; Condensate; Gas Ejectors; Noncondensable Gas; Circulating Water; Steam Turbines; Turbines; Motors; Gear Boxes; Unocal; Toshiba |
Geothermal Resources Council Transactions |
1990 |
English |
| Theistareykir Geothermal Power Plant, A Sustainable Construction |
Knutsson, Valur; Geirsson, Sigurgeir Bjorn; Hjartarson, Hreinn; Emilsson, Jon Arnar |
Power plant design and operation; Environmental aspects; Law |
Geothermal Power Plant; Geothermal utilization; Environmental Impact Assessment; Project planning and construction; Northern Sustainability Project; Geothermal Sustainability Assessment Protocol |
Geothermal Resources Council Transactions |
2018 |
English |
| Innovative Tool for Life-cycle CO2 Emissions Calculation of Geothermal Plants in Upper Rhine Valley |
Pratiwi, Astu Sam; Ravier, Guillaume; Genter, Albert |
Power plant design and operation; Environmental aspects; Air |
Life Cycle Assessment; Global Warming; CO2; Deep Geothermal; Upper Rhine Graben |
Geothermal Resources Council Transactions |
2018 |
English |
| Theistareykir Geothermal Power Plant, Challenges in a Weak Electrical Grid |
Hardarson, Freyr; Heimisson, Birkir; Geirsson, Sigurgeir Bjorn; Emilsson, Jon Arnar; Baldursdottir, Iris; Knutsson, Valur |
Power plant design and operation; Energy markets; Transmissi |
Geothermal Power Plant; Geothermal utilization; Transmission system; Governor; Steam supply |
Geothermal Resources Council Transactions |
2018 |
English |
| Automatic Generation Control and Ancillary Services |
Nordquist, Josh; Buchanan, Tom; Kaleikini, Michael |
Power plant design and operation; Energy markets; Power grid |
— |
Geothermal Resources Council Transactions |
2013 |
English |
| Status and Technical Design of the Cerro Prieto IV Geothermal Project |
Quiroz, P. Alejandro Oropeza; Zuniga, Juan Manuel Wong |
Power plant design and operation; Energy markets |
Mexico; B.C.; Cerro Prieto; Power Generation; Legal; Economics; Utilities; Engineering; Power Plant Design; Engineering Procurement and Construction; Transmission System; BLT (Build Lease and Transfer) |
Geothermal Resources Council Transactions |
1998 |
English |
| Evaluation of Production Capacity of Geothermal Power Plants in Turkey |
Aydin, Hakki; Akin, Serhat; Senturk, Erdinc |
Power plant design and operation; Energy markets |
geothermal, power plant, Gediz Graben, Büyük Menderes Graben, NCG, Turkey |
Geothermal Resources Council Transactions |
2020 |
English |
| The Greenhouse Effect, a Comparison of Greenhouse Gas Contributions from Fossil Fueled and Geothermal Power Plants with Potential Solutions for Emission Reductions |
Morrison, Leslie; Benn, Brian; Sonneville, Allen; McIntush, Ken |
Power plant design and operation; Effluent abatement; NCG |
Climate change, global warming, greenhouse effect, greenhouse gas, global warming potential, CO2 equivalent, Geysers |
Geothermal Resources Council Transactions |
2022 |
English |
| Salton Sea Unit 2: Innovations and Successes |
Hoyer, Dan; Kitz, Kevin; Gallup, Darrell |
Power plant design and operation; Effluent abatement; Hydrog |
Power Generation; Brine Technology; USA; California; Imperial; Salton Sea; Power plant design; H2S Abatement; PH; Chemistry; Brine; Economics; Construction; Costs; Efficiency; Scaling; Process Control; Biox process |
Geothermal Resources Council Transactions |
1991 |
English |
| Improvements in Residence Time and Air Oxidation For H2S Abatement in The Geysers' Geothermal Power Plants With Direct-Contact Condensers and Crossflow Cooling Towers |
Hillard, Catherine; Benn, Brian |
Power plant design and operation; Effluent abatement; Air qu |
Hydrogen sulfide; cooling tower emissions; iron chelate; dissolved oxygen; H2S abatement |
Geothermal Resources Council Transactions |
2014 |
English |
| Removal of Hydrogen Sulfide and Recovery of Carbon Dioxide From Geothermal Non-Condensable Gas Using Water |
Mamrosh, Darryl; Mcintush, Kenneth; Douglas, Austyn; Fisher, Kevin; Juliusson, Bjarni; Gunnarsson, Ingvi; Markusson, Sigurour; Matthiasdottir, Kristin; Arnarson, Magnus |
Power plant design and operation; Effluent abatement; Air qu |
Noncondensable gas; NCG; H2S abatement; hydrogen sulfide removal; CO2 recovery; Iceland |
Geothermal Resources Council Transactions |
2014 |
English |
| Heber Geothermal Demonstration Plant |
Lombard, Gilbert L. |
Power plant design and operation; Economics; Liquid dominate |
Power generation; Economics; Imperial Valley; California; USA; Loop; Demonstration; Reservoir engineering; Flow tests |
Geothermal Resources Council Transactions |
1977 |
English |
| Heber Geothermal Project |
De Haven, Norman J. |
Power plant design and operation; Economics; Laws and regula |
Power Generation; USA; California; Turbines; Pumps; Condensers; Injection; Cooling Towers; Transmission; Power Plant Design; Economics |
Geothermal Resources Council Transactions |
1982 |
English |