Conference Papers Database New search

Performance Improvement of Geysers Power Plant Units 9 & 10

Rossknecht, Libby

Key words
Power Generation; USA; California; Sonoma; Geysers; Case Histories; H2S Abatement; Hydrogen Sulfide; Cooling Towers; Condensers; Condensate; Gas Ejectors; Noncondensable Gas; Circulating Water; Steam Turbines; Turbines; Motors; Gear Boxes; Unocal; Toshiba
Location
The Geysers, California
Conference
Geothermal Resources Council Transactions
Year
1990
Session
Power plant design and operation; Equipment design
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The performance of Geysers Power Plant Units 9 and 10 deteriorated due to the effects of age, increasing undesirable steam constituents, and the introduction of continuous H2S abatement systems. In the ongoing process of trying to reverse this trend and keep the units operating at their full potential, several projects were implemented prior to and during the 1988 unit overhauls. The performance is measure by capacity (% of design generation) and efficiency of stem use (steam rate in lb/kwhr). The capacity was improved form 71.4% to 98.6% and the steam rate was reduced from 20.0 lb/hwhr to 16.3 lb/kwhr. The improvements were aimed at minimizing non generating steam use, eliminating curtailments due to exhaust and first stage pressure limitations and reducing lost generation due to redundant mechanical failures.

Copyright 1990, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 3 October 2026, 9:09 pm.