| Drilling Performance Evaluation and Well Integrity with JIWA DBase |
Monica Gabriella GRACIELLA, Budiman Dwi PUTRA, Muhammad SIDQI, Welly PRABATA, Jantiur SITUMORANG |
Drilling |
drilling performance, well integrity, drilling, database, JIWA |
Stanford Geothermal Workshop |
2024 |
English |
| Success of Multiple Leg Well Completions at the San Jacinto Tizate Geothermal Field, Nicaragua |
K.M. Mackenzie, M.W. Steffen and R. Phillips |
07. Geothermal Engineering - Drilling and Well Testing |
Drilling plan, multiple-leg well, cost-benefit, decision tree, whipstock, inflatable packer |
New Zealand Geothermal Workshop |
2012 |
English |
| Success of Multiple-leg Well Completions at the San Jacinto-Tizate Geothermal Field, Nicaragua |
K.M. Mackenzie, M.W. Steffen and R. Phillips |
Drilling |
Drilling plan, multiple-leg well, cost-benefit, decision tree, whipstock, inflatable packer |
ARGeo |
2012 |
English |
| Cross-Functional Teams for Planning and Monitoring Drilling Projects |
Bailey, Alan; Ohren, Mary; Balamir, Ozgur; Hernandez, Jonathan |
Drilling; Operations management |
Drilling projects; project planning; planning drilling; drilling programs; drilling risk; lessons learned; project management |
Geothermal Resources Council Transactions |
2012 |
English |
| Establishing a Baseline for Global Geothermal Drilling Rates |
Clara LARSON, Jody ROBINS, Katherine R YOUNG, Alfred EUSTES |
Drilling and Completion Technology |
drilling rates, global, lean drilling, manufacturing, |
World Geothermal Congress |
2020 |
English |
| Performance assessment of drilling rigs used in geothermal applications |
Bello, Teodoriu, Falcone |
6 Hydrothermal Systems – Applications (HS2-4) |
Drilling Rig Efficiency, Rig utilisation, Geothermal wells |
European Geothermal Conference |
2013 |
English |
| Applied Logistics for a Drilling Rig Transfer and Maintenance Organization |
Fabrizio Bianchi, Raffaello Caroti, Carlo Paglini and Roberto Parri |
SECTION 5 - Drilling and Completion Technology |
drilling rig transfer, maintenance operations, logistics |
World Geothermal Congress |
1995 |
English |
| Risk Assessment and Risk Modelling in Geothermal Drilling |
Lilian Aketch OKWIRI |
Drilling and Completion Technology |
drilling risks, geothermal drilling, risk management, cost and schedule estimation |
World Geothermal Congress |
2020 |
English |
| A Procedure for Appraisal of Drilling Success |
Ari INGIMUNDARSON, Helga TULINIUS |
General |
drilling success, risk mitigation, well test |
Stanford Geothermal Workshop |
2015 |
English |
| An Investigation of Drilling Success in Geothermal Exploration, Development and Operation |
Sanyal, Subir K.; Morrow, James W. |
Drilling; Risk management; Economics; Business administratio |
Drilling success; Drilling success rate; Drilling risk; Learning curve |
Geothermal Resources Council Transactions |
2011 |
English |
| Drilling of Hot and Fractured Granite at Soultz-Sous-forets (France) |
Jˆrg Baumg‰rtner, Perry Lyman Moore and AndrÈ GÈrard |
SECTION 12 - Advanced Technologies (HDR - Magma - Geopressur |
drilling techniques, mud composition, well completion, milling aluminium packers |
World Geothermal Congress |
1995 |
English |
| Application of Foamed Cement on Hawaiian Geothermal Well |
Bour, Daniel; Rickard, Bill |
Drilling Technology |
Drilling Technology |
Geothermal Resources Council Transactions |
2000 |
English |
| Chemical Grouting Lost-Circulation Zones with Polyurethane Foam |
Mansure, A. J.; Westmoreland, J. J. |
Lost circulation materials; Equipment design; Drilling |
Drilling Technology |
Geothermal Resources Council Transactions |
1999 |
English |
| Research on Durability Improvement of PDC Bits for Geothermal Well Drilling |
Ohno, Tetsuji; Karasawa, Hirokazu; Kobayashi, Hideo |
Drilling; Drill bits; Equipment design |
Drilling Technology |
Geothermal Resources Council Transactions |
1999 |
English |
| The Development and Testing of a High Temperature Bridge Plug for Geothermal Casing Remediation--The Development of the Special Application Coiled Tubing Applied Plug (SACTAP) |
Knudsen, S. D.; Sattler, A. R.; Staller, G. E. |
Well casing; Well servicing; Packers; Equipment design |
Drilling Technology |
Geothermal Resources Council Transactions |
1999 |
English |
| A Proposal for an Advanced Drilling System with Real-Time Diagnostics (Diagnostics-While-Drilling) |
Finger, John; Mansure, A. J.; Prairie, M. R. |
Drilling; Equipment design; Software; Well logging |
Drilling Technology |
Geothermal Resources Council Transactions |
1999 |
English |
| Laboratory Drilling Tests of Advanced Geothermal Turbodrill |
Cohen, John H.; Maurer, William C. |
Drilling; Turbodrill; Equipment design |
Drilling Technology |
Geothermal Resources Council Transactions |
1999 |
English |
| Development and Testing of Insulated Drill Pipe |
Finger, John; Jacobson, Ron; Champness, Tom |
Equipment design; Drill pipes; Drilling; Temperature gradien |
Drilling Technology |
Geothermal Resources Council Transactions |
1999 |
English |
| The Lean Profile: a Step Change in Driling Performance |
A. Calderoni, A. Ligrone & C. Molaschi |
Technology, Economic and Environmental Aspects |
Drilling technology, drilling strategy, drilling cost, casingstring, oil well, Italy |
European Geothermal Conference |
1999 |
English |
| The Fastest Way to the Bottom: Straighthole Drilling Device - Drilling Concept, Design Considerations and Field Experience |
A. Ligrone, J. Oppelt, A. Calderoni & J. Treviranus |
Technology, Economic and Environmental Aspects |
Drilling technology, drilling tool, vertical drilling, oil well, Italy |
European Geothermal Conference |
1999 |
English |