| A Non-Conventional Way of Developing Cement Slurry for Geothermal Wells |
Barlet-Gouedard, V.; Vidick, B. |
Drilling and Completion; Cement Slurry; Geothermal Wells; Th |
Drilling and Completion; Cement Slurry; Geothermal Wells; Thermodynamics |
Geothermal Resources Council Transactions |
2001 |
English |
| A Proposal for the Real-Time Measurement of Drill Bit Tooth Wear |
Cooper, G. A. |
Drilling and Completion; Drill Bits; Simulation; Wear |
Drilling and Completion; Drill Bits; Simulation; Wear |
Geothermal Resources Council Transactions |
2002 |
English |
| PDC Bits Demonstrate Benefit Over Conventional Hard-Rock Drill Bits |
Raymond, David W. |
Drilling and Completion; Drilling; Drill bits; Roller Cones; |
Drilling and Completion; Drilling; Hard Rock; PDC Bits; Roller Cones; Drilling Costs; Abrasion; Bit Vibration |
Geothermal Resources Council Transactions |
2001 |
English |
| Effects of Design and Processing Parameters on Performance of PDC Drag Cutters for Hard-Rock Drilling |
Wise, Jack L.; Raymond, David W.; Cooley, Craig H.; Bertagnolli, Ken |
Drilling and Completion; Hard Rock; PDC Cutters; PDC Bits; A |
Drilling and Completion; Hard Rock; PDC Cutters; PDC Bits; Abrasion; Impact; Wear |
Geothermal Resources Council Transactions |
2002 |
English |
| Geothermal Drilling on the Kuril Islands: The Study of Deep Cross Sections |
Rychagov, S. N.; Glavatskikh, S. F.; Belousov, V. I.; Zhatnuev, N. S.; Korobov, A. D.; Koroleva, G. P.; Ladygin, V. M. |
Drilling and Completion; Magmatism |
Drilling and Completion; Hydrothermal Magmatic Systems; Geothermal Drilling; Cross Sections; Structure; Geothermal Reservoir; Minerals; Ore Elements |
Geothermal Resources Council Transactions |
2001 |
English |
| Evaluating Light-Weight Cement in the Geothermal Environment |
Batcheller, Gary W. |
Drilling and Completion; Lightweight Cement; Foam Cement; Ac |
Drilling and Completion; Lightweight Cement; Foam Cement; Acoustic Impedance; Casing; Ultrasonic Logs; Acoustic Logs; Micro Annulus |
Geothermal Resources Council Transactions |
2002 |
English |
| Indonesian LCM Evaluation Tests Using a Modified API Bridging-Materials Tester |
Gronewald, P. J.; Mansure, A. J.; Staller, G. E. |
Drilling and Completion; Lost Circulation; Polymer & Drillin |
Drilling and Completion; Lost Circulation Material; LCM; Polymer & Drilling |
Geothermal Resources Council Transactions |
2001 |
English |
| Polyurethane Grouting of Rye Patch Lost Circulation Zone |
Mansure, A. J.; Westmoreland, J. J.; Staller, G. E.; Jacobson, R. D.; Libengood, H.; Smith, E.; Galbreath, D.; Rickard, W. M. |
Drilling and Completion; Lost Circulation; Borehole Stabiliz |
Drilling and Completion; Lost Circulation; Borehole Stabilization; Polyurethane; Grout; Drilling |
Geothermal Resources Council Transactions |
2001 |
English |
| Proposal for New Type of Downhole Percussion Drills for Hard Rock Drilling |
Karasawa, Hirokazu; Ohno, Tetsuji; Ota, Akinori; Kaneko, Tsutomu; Koizumi, Masahiro; Yamada, Naoto; Miyamoto, Tetsuomi |
Drilling and Completion; Percussion Drill; Mud Hammer; Downh |
Drilling and Completion; Percussion Drill; Mud Hammer; Downhole Motor; Hard Rock; Drilling |
Geothermal Resources Council Transactions |
2002 |
English |
| Application of Dual-Tube Flooded Reverse Circulation Drilling to Rye Patch Lost Circulation Zone |
Rickard, W. M.; Johnson, Bob; Mansure, A. J.; Jacobson, R. D. |
Drilling and Completion; Reserve Circulation; Drilling Rig; |
Drilling and Completion; Reserve Circulation; Drilling Rig; Lost Circulation; Drilling |
Geothermal Resources Council Transactions |
2001 |
English |
| Deep Wireline Coring in Geothermal Reservoirs |
Nielson, Dennis L. |
Drilling and Completion; Reservoir modeling; Formation Damag |
Drilling and Completion; Reservoir Characterization; Formation Damage Recompletion; Injection well drilling |
Geothermal Resources Council Transactions |
2001 |
English |
| Numerical Simulation of Anhydrite Scaling in Production Well at the Sumikawa Geothermal Field, Japan |
Kato, Hisao; Kamei, Junko; Kitao, Koji; Muramatsu, Yoichi |
Drilling and Completion; Scaling |
Drilling and Completion; Scale; Chemical Equilibrium; Kinetics; Numerical Simulation |
Geothermal Resources Council Transactions |
2001 |
English |
| The Use of a Drilling Simulator to Optimize a Well Drilling Plan |
Abouzeid, A. A.; Cooper, G. A. |
Drilling and Completion; Simulation |
Drilling and Completion; Simulation; Optimization; Planning |
Geothermal Resources Council Transactions |
2001 |
English |
| Small Geothermal Development System Using Slim Hole Drilling Techniques for Remote Powering |
Ciptomulyono, Udibowo |
Drilling and Completion; Slimholes |
Drilling and Completion; Slim Hole; Remote Powering; Least Cost; Modular Unit |
Geothermal Resources Council Transactions |
2002 |
English |
| Drilling Plan into the Recently Erupted Unzen Volcano and Borehole Temperature Simulations |
Saito, Seiji; Hatakeyama, Nobuo |
Drilling and Completion; Temperature Simulation; Volcano Dri |
Drilling and Completion; Temperature Simulation; High Temperature; Volcano Drilling; Scientific Drilling; Unzen |
Geothermal Resources Council Transactions |
2001 |
English |
| Mitigation of Cyclic Production Behavior in a Geothermal Well at the Uenotai Geothermal Field, Japan |
Iwata, Shun; Nakano, Yuji; Granados, Eduardo; Butler, Steven; Robertson-Tait, Ann |
Drilling and Completion; Cycling Behavior; Remediation; Tubu |
Drilling and Completion; Uenotai; Cycling Behavior; Remediation; Coiled Tubing; PTSD Tool |
Geothermal Resources Council Transactions |
2002 |
English |
| Casing Mechanical Integrity Tests Utilizing Wireline Ultrasonic Imaging Logs |
Rushing, Jerry |
Drilling and Completion; Ultrasonic; Logs; Logging; Mechanic |
Drilling and Completion; Ultrasonic; Logs; Logging; Mechanical Integrity; Corrosion |
Geothermal Resources Council Transactions |
2001 |
English |
| Mechanical Property Issues for Geothermal Well Cements |
Philippacopoulos, A. J.; Berndt, M. L. |
Drilling and Completion; Well Cements; Material Properties; |
Drilling and Completion; Well Cements; Material Properties; Finite Element analysis; Well Integrity |
Geothermal Resources Council Transactions |
2001 |
English |
| Production Variations after Repairing Wells of the La Primavera Geothermal Field, Mexico |
Sanchez-Upton, Pedro |
Drilling; Well completion; Wellbore Simulation |
Drilling and Completion; Wellbore Simulation; Productivity Index; La Primavera; Mexico |
Geothermal Resources Council Transactions |
2001 |
English |
| Drilling Performance Improvements of Salak Geothermal Field, Indonesia 2006 - 2008 |
Muhamad Jose Prihutomo, Subur Arianto |
21. Drilling and Completion Technology |
Drilling Campaign, Perfect Well Targeting, Performance Monitoring, Critical Success Factor, Stuck Pipe Prevention, Drilling Management Tools |
World Geothermal Congress |
2010 |
English |