Conference Papers Database New search

Risk Control for Disaster at the Geothermal Field

Masaho Adachi

Location
Yanaizu-Nishiyama, Japan
Conference
Asian Geothermal Symposium
Year
2011
Language
English
Paper number
114

Full text

3607, opens in a new tab

Abstract

Many electrical power plants by Pacific Ocean side in Tohoku area were visited by 2011 March 11’s Great Eastern Japan Earthquake, however, inlying geothermal power plant continued to generate electricity. From this, people looked at geothermal power plants’ role in arguments about how national preparation against crisis should be. Geothermal power generation is potential natural resources business, however, its resources lie in the non-visible underground and furthermore the production of high temperature and flowing geothermal vapor has many risks. It is important to recognize these risks and to accumulate vast experience and knowhow. In Yanaizu Nishiyama Geothermal Power Plant, we listed 7 major risks for vapor supply business, and each point is segmentalized. We are studying the countermeasures based on occurrence frequency and severity of each risk in order to be prepared for the worst crisis.

Copyright 2011, Asian Geothermal Symposium. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.74 (216.73.217.74).
Viewed 21 September 2026, 7:11 pm.