Development of an Advanced Geothermal Reservoir Management System for the Harmonious Utilization with Hot Spring Resources
- Key words
- geothermal system, hot springs, interference, monitoring, simulation, system integration
- Location
- Hachijo, Japan
- Conference
- Asian Geothermal Symposium
- Year
- 2011
- Language
- English
- Paper number
- 52
Full text
1524, opens in a new tab
Abstract
A three-year research project has begun in 2010 to develop an integrated geothermal reservoir operation system for adequately controlled utilization and to prove that geothermal exploitations can be performed without interference to nearby hot springs. The project consists of three parts: Geothermal system modeling and integration of a reservoir operation system, Development of monitoring techniques, and Estimation of reservoir change by numerical simulation. In the first year of the project, the Hachijo island geothermal area was chosen as a model field and various field surveys and monitoring were conducted. The final goal of the project is to construct an integrated system that enables evaluation of the effects on hot springs by a geothermal development that may contribute to promote geothermal exploitation in Japan.
Copyright 2011, Asian Geothermal Symposium. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.