Conference Papers Database New search

Cerro Prieto IV, the Newest Power Plant in Cerro Prieto Geothermal Field

Juan De Dios Ocampo DÌaz

Location
Cerro Prieto, Mexico
Conference
Stanford Geothermal Workshop
Year
2005
Session
Production Engineering
Language
English
Paper number
Ocampo2

Full text

126KB, opens in a new tab

Abstract

The Cerro Prieto IV power plant is the newest power plant in Cerro Prieto field, it started the production commercial generating in 2000, at present the entire installed capacity of generation in the geothermal field of Cerro Prieto is 720MW, the plant C.P.IV has a capacity of 100MW distrib-uted in four units of 25 MW each one, these units are fed by the steam produced by twenty wells approximately, this article presents the information of electrical energy generation through four years, as well as it mentions the principal operative problems that have registered in this Power Plant.

Copyright 2005, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.216.199 (216.73.216.199).
Viewed 22 September 2026, 5:09 am.