An EGS/HSA concept for Singapore
- Key words
- Concept, EGS, Singapore
- Location
- Singapore
- Conference
- Australian Geothermal Energy Conference
- Year
- 2010
- Language
- English
Full text
862KB, opens in a new tab
Abstract
Hot springs are a good indicator for geothermal resources in Singapore. An Engineered Geothermal System (EGS) for commercial power generation would require 3 km deep directional wells in hot sedimentary aquifers (HSA) or in hot, wet, fractured granite and the generation of electricity from +150 o C hot water through binary cycle turbines with the ‘waste’ water being recycled down injection wells. Proof of concept for a 50 MW power station might cost US$ 19 million. Development costs (US$ 200 million) could be written off in 6.4 years after production started. Large corporations and the military could benefit from autonomous geothermal power sources (e.g. electricity, heat processing, district cooling). Several neighbourhood 50 MW geothermal power stations could provide part of the national base load with ‘renewable’, clean, green power generation of strategic importance for a country that is viewed as having no natural resources.
Copyright 2010, Geoscience Australia. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.