Levelised Unit Cost - a Calculation and Reporting Methodology
- Key words
- Unit generation costs, Levelised Cost, calculating unit electricity generation costs, geothermal
- Conference
- Australian Geothermal Energy Conference
- Year
- 2009
- Language
- English
Full text
130KB, opens in a new tab
Abstract
To ensure there is no confusion, contradiction and a fair and meaningful comparison within the geothermal and investment community in relation to the use of uit generation costs, the adoption of a standardised methodology for cost calculations and reporting among different electricity generators is a prerequisite. The Australian Geothermal Energy Association, AGEA, proposes to use levelised Cost as the unit cost measure to be quoted when companies report average unit generation costs.
Copyright 2009, Geoscience Australia. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.