Challenges for a Future Australian Electricity Network Dominated by a Geothermal Hub

Saha

Location
Australia
Conference
Australian Geothermal Energy Conference
Year
2008
Language
English

Full text

66.9KB, opens in a new tab

Abstract

When a large power plant is located far away from major load centres and also from the high voltage transmission grid, a number of significant issues need to be investigated. In the context of huge potential for geothermal energy in the area of Cooper Basin, electricity transmission issues will provide some key challenges and opportunities for a future secured power network for the Australian national electricity grid. The Cooper Basin does not have electricity consumers next to it, so the power would have to be transmitted quite a long distance over costly transmission facilities. For example, the Innamincka power plant, which plans to produce 50 MW in 2012, will send electricity over 110 kms of transmission lines to the Moomba oil and gas field. It is understood that a 500 MW plant will be built by 2016, which is expected to supply power through a 500 km high-voltage transmission line to the national electricity grid in Port Augusta, and a transmission line to BHP Billiton

Copyright 2008, Geoscience Australia. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.141 (216.73.217.141).
Viewed 21 September 2026, 10:08 pm.