Conference Papers Database New search

Challenges of Human Capacity Building: GDC’s Experience

Irene N. Onyambu

Location
Kenya
Conference
ARGeo
Year
2010
Session
Training and Capacity Building
Language
English

Full text

83KB, opens in a new tab

Abstract

The East African Rift System, which is estimated at having over 15000MWe of clean geothermal energy, covers eleven countries among them being the Republic of Kenya. The development of this high and largely untapped resource has been very slow in Kenya. The country’s first 15 MWe unit of the 45 MWe electric power generating plant was commissioned in 1981. It has been operating since then and has proven reliable and economical, running at 98% availability (Ng’ang’a, 1998). The total installed geothermal capacity in the country currently stands at 128 MWe. Demand for electricity has been on the rise and future growth projection in Kenya requires that urgent initiatives are undertaken to ensure electric energy capacity addition is adequate to cover this demand. One key initiative undertaken by the Government of Kenya is the establishment of Geothermal Development Company Ltd (GDC) as a special purpose vehicle to accelerate the development of geothermal energy resources in the country. GDC, incorporated on the 2nd of December 2008, robustly began operations in Mid 2009 with the appointment of key members of the top management. With the entrance of GDC into the Kenyan energy sector, there is need, more than ever, to build capacity in order to adequately and effectively harness this environmentally friendly resource – the geothermal resource.

Copyright 2010, ARGeo. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.48 (216.73.216.48).
Viewed 21 September 2026, 8:31 am.