Conference Papers Database New search

Geothermal power generation through application of low temperature turbine (LTT) power generation technology

Lars Tallbacka, Otar S. Vardigoreli

Key words
Power generation, turbine, rock
Location
Zugdidi-Tsaishi, Georgia
Conference
International Geothermal Workshop, Russia
Year
2003
Session
Binary Power Plants
Language
English
Paper number
W00030

Full text

341KB, opens in a new tab

Abstract

Western Georgia has abundant geothermal energy resources retained in aquifer waters of Lower Cretaceous fractured and karstified limestones and dolomites located at depths between 2,500-4,000 m. Flowing wellhead temperatures are reported in the range 90?-110?C, the installed geothermal capacity amounts to 312 MW. Application of the currently developed low temperatures turbine (LTT) power generation process would suggest the potentially available annual geothermal power supply to the tune of 530 GWh, enough to power around 150,000 households. The LTT power generation process is applicable at geothermal water temperatures from 85?C and higher with a postulated efficiency up to 23%. This paper describes the LTT power generation process and further summarises the salient parameters and general conditions attributed to a tentative geothermal power pilot project located in the Zugdidi-Tsaishi area, western Georgia. Preliminary calculations reveal a financial rate of return (FRR) for this project between 15-20%.

Abstract file

Open the abstract

Copyright 2003, Association of Geothermal Energy Soc. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.2 (216.73.217.2).
Viewed 24 September 2026, 8:53 pm.