Subsequent State of Development in the Mataloko Geothermal Field, Flores, Indonesia
- Key words
- Development, Geothermal Field, Mataloko, MT-2, MT-3, MT-4, Monitoring, Drilling, Indonesia
- Location
- Mataloko, Indonesia; Flores
- Conference
- Asian Geothermal Symposium
- Year
- 2004
- Session
- High-Temperature Resource Development
- Language
- English
Full text
1.7 MB, opens in a new tab
Abstract
The research cooperation project of the Exploration of Small Scale Geothermal Resources in the Eastern part of Indonesia (ESSEI) in 1997 – 2002 has resulted in more detailed surface and subsurface geosientific data of the Mataloko Geothermal Field. The promising area of the Mataloko Geothermal Field is well delineated by the integrated exploration and has been proven by the Well MT-1 and MT-2. The MT-2 drilled until the TD of 180,02m can produce steam of 16 ton per hour. This paper describes subsequent state of development in the Mataloko Geothermal Field since the Indonesia-Japan cooperation research program finished. This includes MT-2 well monitoring, well drilling of MT-3 and MT-4, Well Testing of MT-3 and MT-4, planning of development of the 2.5 MW geothermal power plant.
Copyright 2004, Asian Geothermal Symposium. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.