Conference Papers Database New search

Geothermal Energy Potential of Uganda

Godfrey Bahati and Agnes Alaba

Location
Uganda
Conference
ARGeo
Year
2008
Language
English

Full text

1700KB, opens in a new tab

Abstract

Uganda is currently facing power shortages withd emand exceeding supply by about 130MW. This is mainly due to climaticf luctuations that have reduced hydropower output from 380MW, the capacity of hydropower dams at Jinja, to less than 150MW. This has forced government (GoU) to license Independent Power Producers (IPPs) as a short-term measure to produce electricity from thermal plants to reduce on the shortfall. Despite its considerable hydro resources, the GoU recognizes that it must diversify its energy resources. The present level of uncertainty in climate change and increasing environmental awareness have increased government

Copyright 2008, ARGeo. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.2 (216.73.217.2).
Viewed 21 September 2026, 2:08 am.