Title:

Feasibility Study of Geothermal Utilization in Yangbajain Field of Tibet, China

Authors:

Caixia Sun

Key Words:

feasibility study, geothermal, power cycle, district heating, IRR, sustainability

Geo Location:

Yangbajain, China; Tibet

Conference:

World Geothermal Congress

Year:

2010

Session:

38. Integrated Energy Systems, Cascaded Uses

Language:

English

Paper Number:

3810

File Size:

835KB

View File:

Abstract:

This study investigates the feasibility of renewable energy utilization in Tibet, China. Based on the available energy assessment and market analysis, a technical and economic feasibility study is carried out on geothermal development and utilization of Yangbajain field with the objective of solving both electricity shortage and lack of space heating in order to improve living conditions of the Tibetan people.
The technical feasibility study contains thermodynamic models of proposed different power generation scenarios and long distance district heating system to analyze and optimize each scenario by using EES and Matlab programs. The four alternative scenarios optimized for new power plant design are double flash cycle (Scenario 1), hybrid single flash and ORC cycle with isopentane as the working fluid (Scenario 2), pure ORC cycle with isobutane as the working fluid (Scenario 3), and a hybrid single flash and Kalina cycle (Scenario 4). The conceptual design of district heating system with about 90km distance from Yangbajain to Lhasa is carried out as well. The results indicate that all power cycles are technically feasible at different efficiencies and that the district heating system can be implemented with appropriate design and construction considerations. A financial viability evaluation is performed for all scenarios using engineering economic Present Worth (PW) value analysis method with the objective to determine the Internal Rate of Return (IRR) of each system. The optimum power cycle scenario is Scenario 1 with IRR value of 31.84%, followed by Scenario 2 with IRR value of 22.15%. The district heating system has a low IRR value of 3.13% due to the high investment cost of a long distance transmission pipeline. However, as part of an entire system of CHP power plant, the optimum system can yield 8.92% IRR value at pure commercial investment level. Since it will be a subsidized program from the central government, it can reach 10.78% of IRR value without incurring loan interest payments. If the expected IRR of the investment company is 10.00%, it proves this project is economically feasible.


ec2-3-230-162-238.compute-1.amazonaws.com, you have accessed 0 records today.

Press the Back button in your browser, or search again.

Copyright 2010, International Geothermal Association: Readers who download papers from this site should honor the copyright of the original authors and may not copy or distribute the work further without the permission of the original publisher.


Attend the 2020 World Geothermal Congress, Iceland, 2020, click here for details.

Accessed by: ec2-3-230-162-238.compute-1.amazonaws.com (3.230.162.238)
Accessed: Thursday 28th of March 2024 03:34:25 PM