Conference Papers Database New search

The CDM and Geothermal Projects, Indonesia

Fadli Cahyono

Key words
Clean Development Mechanism, Project Cycle
Location
Indonesia
Conference
World Geothermal Congress
Year
2010
Session
35. Clean Development Mechanism
Language
English
Paper number
3510

Full text

112KB, opens in a new tab

Abstract

Developing a geothermal power plant project is a financial challenge, and is harder than developing more traditional forms of renewable energy. One aim of the Kyoto protocol is to speed up the development of renewable energy power and indeed the evolution of such sources over the last decade has increased.

A Geothermal power plant project is considered a major long term investment due to the resources required and the length of payback period. Fortunately, there is an alternative additional funding source to contribute to the long term financial performance of geothermal projects. The UNFCCC (United Nations Framework Convention on Climate Change) has developed, as part of the Kyoto protocol, three flexibility mechanisms to help finance renewable projects and to reduce greenhouse gas (GHG) emissions worldwide. The Clean Development Mechanism (CDM) is one of these, which allows developing countries to participate and benefit from mankind’s effort to save the earth.

For a geothermal project to receive carbon credits there are a set of certification stages to fulfill. The process requires careful attention and aid from CDM project partners.

Copyright 2010, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 27 September 2026, 9:51 am.