A Parallelized Model For Simulating A Vertical Closed-Loop Geothermal Heat Pump System

Seong-Kyun Kim, Gwang-Ok Bae, Uk Han, and Kang-Kun Lee

Key words
Geothermal heat pump, borehole heat exchanger, parallelized simulation model
Conference
World Geothermal Congress
Year
2010
Session
32. Software for Geothermal Applications
Language
English
Paper number
3214

Full text

968KB, opens in a new tab

Abstract

A borehole heat exchanger (BHE) is one of the important factors that can affect performance of the vertical closed-loop geothermal heat pump (GHP) system. Its construction costs are also a large percentage of the overall initial costs of the GHP system. When constructing BHEs, several parameters should be determined, such as length of the borehole heat exchanger, the number of the BHEs, and spacing between BHEs. Numerical simulation can be used to find optimal parameters. However, it takes a long time to find optimal parameters with a large domain. To reduce the calculation time, a massively parallel computing procedure is introduced into the serial simulator for the vertical closed-loop GHP system. It can simulate temperature changes in the BHE with circulating fluid through the U-tubes and compute groundwater flow and aquifer temperature changes. By increasing the number of processors, the total execution time was reduced from 7,031 seconds using two processors to 1,145 seconds using 32 processors. The total execution time of the serial model is 13,902 seconds.

Copyright 2010, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.