Scale Inhibitor Application in KD-14 Well of Kizildere Geothermal Field
- Key words
- CaCO3 scale mitigation, inhibitor, geothermal, Kızıldere
- Location
- Kizildere, Turkey
- Conference
- World Geothermal Congress
- Year
- 2010
- Session
- 27. Corrosion and Scaling
- Language
- English
- Paper number
- 2738
Full text
235KB, opens in a new tab
Abstract
Kızıldere Field is the first geothermal field of Turkey that was used to generate electricity. The field is located in the Denizli and Aydın Provinces of Western Turkey in the northeastern end of the Büyük Menderes Graben. Power production from the field was started in 1984 with an installed capacity of 17.4 MWe. One feature of the field is the calcite scaling tendency of the geothermal fluid which hinders the power output due to frequent need of mechanical cleaning in the wells. After acquiring the operational rights of the field on September 1, 2008, Zorlu Energy launched a complete remediation operation to produce maximum achievable power from the field. One of the measures taken by Zorlu was to find an alternative solution for mechanical reaming of calcite scaling. A scale inhibitor test with 10 different chemicals was carried out in KD-14 and continuous inhibitor injection was started after having optimized inhibitor concentration as well as type of inhibitor. This paper will address the inhibitor selection test and the results of continuous inhibitor injection in KD-14.
Copyright 2010, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.