Conference Papers Database New search

Parasitic Load Efficiency Program Kamojang Generation Business Unit Pt. Indonesia Power, Indonesia

Pelitabaru Pakpahan, Ruly Husnie Ridwan, Irwan Edi S. Lubis

Key words
Parasitic load efficiency program
Location
Kawah Kamojang, Indonesia; Java
Conference
World Geothermal Congress
Year
2010
Session
26. Power Generation
Language
English
Paper number
2616

Full text

118KB, opens in a new tab

Abstract

The existence of an electricity energy crisis in Indonesia has continued to drive UBP Kamojang efforts to lessen parasitic load at each geothermal power generation unit. The aging of the equipment combined with the increasing demand has forced UBP Kamojang management to decrease the parasitic load as soon as possible (parasitic load efficiency program). This paper will explain the strategy which has and will be applied by UBP Kamojang management to implement this program. Execution of this program has a cost benefit ratio which is relatively large, that is ± IRD 1.38 Milliard per year.

Copyright 2010, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 26 September 2026, 3:09 pm.