Conference Papers Database New search

Squeeze with Foamed Cement Cuts Nonproductive Time in a Geothermal Well

Dennis Lovett, Rafael Hernandez, Lyndon Chandarjit

Key words
Foamed cement, squeeze, lost circulation, cement plugs
Conference
World Geothermal Congress
Year
2010
Session
21. Drilling and Completion Technology
Language
English
Paper number
2140

Full text

1406KB, opens in a new tab

Abstract

During geothermal-drilling operations in a field in central California, the operating company reduced nonproductive time (NPT) by 78% by squeeze cementing a lost-circulation (LC) zone with cement foamed by adding nitrogen to the slurry.
The slurry design chosen was nitrogen-foamed Class G cement with an accelerator. A slurry volume of 3,000 sacks pumped in three foam squeeze stages (approximately 1,000 sacks each) repaired the well and enabled drilling ahead. The process took three days to complete; similar operations in the area where conventional cements and processes were applied typically required two weeks to complete.
This paper presents the case history of the last of the three foamed cement squeeze stages performed. Cementing challenges, solutions, wellbore diagrams, and job procedures are discussed.

Copyright 2010, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 26 September 2026, 6:56 am.