An Effective Well Development Method for Deep Screen Completed Wells

Jan-Erik Rosberg

Key words
Well development, hydro-jetting, coiled tubing
Location
Lund, Sweden
Conference
World Geothermal Congress
Year
2010
Session
21. Drilling and Completion Technology
Language
English
Paper number
2119

Full text

409KB, opens in a new tab

Abstract

In Lund, Sweden productivity problems were encountered during flow testing of a 1927 m deep gravel packed screen completed well and it became apparent that well development was needed to increase productivity. A hydro-jetting system using coiled tubing in combination with simultaneous pumping was developed and tested and found to be successful. To verify whether the well development improved the well, the results of a pumping test conducted before and after the jetting operation were compared. In addition flowmeter logging during the jetting operation was also used to verify the improvements. Hydro-jetting in combination with simultaneous pumping proved to be an effective cleaning method. After 100 minutes of pumping, there was approximately 110 m less drawdown and 15 l/s higher average flow rate compared to the values before the jetting operation. Influence of wellbore storage was significant during the flow tests carried out before the well development, but was negligible thereafter.

Copyright 2010, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.25 (216.73.216.25).
Viewed 22 September 2026, 11:27 am.