Conference Papers Database New search

Geothermal Doublets Munich Riem and Pullach I. Isartal in Comparison: Geological and Drilling Concepts for Minimizing the Geological Risk in the Deep Malm Aquifer

A. Schubert; R. Höferle; F. Böhm

Location
Riem, Germany; Pullach, Germany
Conference
European Geothermal Conference
Year
2007
Session
Geothermal Energy Use in Munich Area
Language
English
Paper number
044

Full text

545KB, opens in a new tab

Abstract

In 2003, the geothermal doublet Munich Riem for the Munich public utility company (Stadtwerke Muenchen GmbH) was successfully completed at the eastern edge of the Munich-Riem fairgrounds. This was followed in the winter/spring 2004 by the successfully drilled well Unterhaching GT1 for the municipality Unterhaching. Finally, after the municipality Pullach i. Isartal decided in the summer of 2004 to go forward with the Pullach geothermal project, the geothermal doublet in Pullach was successfully drilled in the summer of 2005 (Fig. 1).

Copyright 2007, Geothermische Vereinigung e.V. - Bundesverband Geothermie. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.115 (216.73.216.115).
Viewed 22 September 2026, 10:07 am.