Economic Evaluation of Alternative Strategies of Geothermal Exploitation
- Key words
- plant size and reservoir optimization
- Conference
- World Geothermal Congress
- Year
- 1995
- Session
- SECTION 14 - Economics, Financing, Marketing and Training
- Language
- English
- Paper number
- 4-Girelli
Full text
Opens in a new tab
Abstract
fair approximation the actual hehaviour of the fields. it possihle simulate the of undrr exploitation Matching the of the field with the energy generated hy alternative of the power the economic of the alternatives have calculated. show that the generally adopted criterion of installing the which guarantees a maximum load for technical life of the plant is not the best from the economic standpoint. In the simulated case. the maximum continuous load for years is YO MW, hut the minimum production cost is achieved with a plant of MW and the maximum total with a plant of MW. In thcsc a decline of production with respect to the installed capacity is predicted during of plant.
Copyright 1995, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.