Conference Papers Database New search

Resource Evaluation and Development Strategy, Awibengkok Field

L.E. Murray, D.T. Rohrs, T.G. Rossknecht, Roes Aryawijaya and Kris Pudyastuti

Key words
field history, resource evaluation, model
Location
Awibengkok, Indonesia; Java
Conference
World Geothermal Congress
Year
1995
Session
SECTION 6 - Resource Evaluation and Modeling
Language
English
Paper number
3-murray

Full text

Opens in a new tab

Abstract

The Awibengkok geothermal field, west java, Indonesia began generation of 110 MWe in early 1994 and is currently being expanded to 330 MWe. The initial series of five exploration wells delineated a geothermal resource with high temperatures, substantial volume and relatively benign fluids. Interference testing utilizing the exploration wells was successfully used to measure field permeability. Based on high measured field permeability, large diameter wells were drilled to demonstrate commercial deliverability. A numeric modeling approach recognizing the uncertainty in interference tests and other factors was implemented to determine the production capacity of the reservoir. The numeric model continuously refined and calibrated fo field performance demonstrated that the field can sustain 330 MWe over the contract live and provides a basis for optimizing reservoir management strategies.

Copyright 1995, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.105 (216.73.217.105).
Viewed 24 September 2026, 5:06 pm.