Geothermal Plant in Thisted with Absorption Heat Pump and 10 Years Operation Without Corrosion or Reinjection Problems in Sandstone for 15% Saline Water

Allan Mahler

Key words
combined, absorption, CO2, injection,, sandstone, saline
Location
Thisted, Denmark
Conference
World Geothermal Congress
Year
1995
Session
SECTION 10 - Direct Heat Uses
Language
English
Paper number
3-mahler2

Full text

Opens in a new tab

Abstract

A geothermal pilot plant with an electric heat pump was erected by Dansk Olie og Naturgas in 1984 and expanded to the present demonstration plant with an absorption heat pump in 1988. The use of an absorption heat pump nearly eliminates energy consumption and operation costs for the heat pump. The absorption heat pump is by now driven by heat from a combined heat and power incineration plant and the driving heat is fully recovered on the district heating network. The design has made it possible to avoid corrosion problems and to reinject millions of cubic meters of a 15% saline geothermal water in a sandstone reservoir. Heat production costs, plant concept, operating experiences and absorption heat pump are discussed. The reservoir temperature at 1250 m is 46?C and the transmissivity Dm.

Copyright 1995, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.92 (216.73.217.92).
Viewed 24 September 2026, 3:34 pm.