Comparative Analysis of Estimation of Horizontal Geothermal Well Productivity
- Key words
- horizontal well productivity, numerical simulation, anisotropic reservoir
- Conference
- World Geothermal Congress
- Year
- 1995
- Session
- SECTION 6 - Resource Evaluation and Modeling
- Language
- English
- Paper number
- 3-magomedov
Full text
Opens in a new tab
Abstract
This work compares some of the most commonly used solutions discusses estimates of horizorital well productivity through numerical is a powerful for paring the productivity of vertical and horizontal wells since it can account natural fractures, three flow and a variety of rv The importance of estimation for geothermal well is shown.
Copyright 1995, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.