Conference Papers Database New search

Experience of creation and operation of geothermal power plants at Mutnovsky geothermal field, Kamchatka, Russia

Oleg Povarov, Valery Saakyan, Alexandre Nikolski, Victor Luzin, Grigory Tomarov and Maxim Sapozhnikov

Key words
geothermal, electric power generation, condensing, binary cycle
Location
Mutnovsky, Russia; Kamchatka
Conference
Iceland Geothermal Conference
Year
2003
Session
Binary cycles ?? Power generation
Language
English

Full text

433KB, opens in a new tab

Abstract

The energy development strategy of the Kamchatka Region lies in its entire conversion to use of geothermal resources. The Mutnovsky geothermal reservoir is well-studied and found adequate to ensure the operation of a geothermal power plant with more than 300MWe total capacity. The program of construction of the geothermal power plant series at the Mutnovsky steam-field is under active implementation by Geotherm SC. In 1999, a 12 (3x4) MWe Verchne-Mutnovsky geothermal power plant was put into operation, and in 2002, the 1st stage of the 50 (2x25) MWe Mutnovsky geothermal power plant was constructed. It is planned to construct the 2nd stage of the Mutnovsky geothermal power plant with a capacity of 100 MWe and to start works on the creation of the 4th geothermal power unit with 4.0 MWe capacity utilizing binary cycle at the Verchne-Mutnovsky geothermal power plant.

Copyright 2003, Geothermal Association of Iceland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.152 (216.73.216.152).
Viewed 24 September 2026, 12:39 am.