Achievement Ratio of Drilling Wells in the Kirishima Geothermal Field, Japan
- Key words
- drilling cost, success ratio of wells, Japan
- Location
- Kirishima, Japan
- Conference
- World Geothermal Congress
- Year
- 1995
- Session
- SECTION 5 - Drilling and Completion Technology
- Language
- English
- Paper number
- 2-Kodama
Full text
Opens in a new tab
Abstract
For the development of geothernal energy utiIization. equipment cost reduction is one of the most important factors. In Japan, the cost ratio of driIIIs for geothermal energy amounts to about of development cost. Achievement geothermal I s is a key factor for cost examples of 60-84% achievement ratio have been published in Japan. Kirishima Geothermal Project was divided into four development stages. For this established achievement targets for each stage. The attained achievement results were 88-92% against the planned ratio of 80 This is a very good result compared to the above ished f papers explain the the drilling results and refer to items to be solved in the future.
Copyright 1995, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.