Wellhead Units and Geothermal Development in El Salvador
- Key words
- geothermal development, power generation, wellhead units, El Salvador
- Location
- El Salvador
- Conference
- World Geothermal Congress
- Year
- 1995
- Session
- Section 1 - Rapporteurs' General Reports and Country Updates
- Language
- English
- Paper number
- 1-campos
Full text
Opens in a new tab
Abstract
Backpressure and condensing units have been strategically positioned in the expansion plan El Salvador to make it efficient bath technically and economically. Four 5 Mu each backpressure units were acquired, each with different technical features to the tield conditions for which they were A locally designed arrangement 2x5 Mu units was at Berlin, two producers single which feeds in the turbines located in the lower elevation The units have satisfactorily 3 years, showing efficiency over the operating of steam flows and helping to discover problems related to corrosion, damage in the wells, effects and silica depositions.
Copyright 1995, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.