Toshiba's Experiences of Geothermal Power Plant and Their Features

Hiroyuki Ohira, Hiroshi Hamano and Nobuo Okita

Key words
geothermal, power plant, steam turbine
Conference
World Geothermal Congress
Year
2000
Session
Power Generation
Language
English
Paper number
R0747

Full text

627, opens in a new tab

Abstract

Toshiba has supplied and experienced long operations of several thousand kW to 110-120MW plants, thus we have now share of approx. 30% in total capacity of geothermal plants all over the world. The amount of total capacity of ToshibaĆ­s geothermal steam turbines has reached approx. 248MW with 7 units for Japanese domestic plants and more than 2556MW with 45 units for overseas plants. The recent Japanese domestic geothermal plants are represented by Uenotai plant(28.8MW) which is the first unit of a totally rationalized plant, Yanaizu-Nishiyama plant (65MW) applying parallel operation of gas extraction system by compressors and steam ejectors for high gas content, and Kakkonda No.2 plant (30MW) first applying a dry-wet cooling tower in Japan in order to prevent visual white exhaust moisture and icing of surrounding trees.

Copyright 2000, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.227 (216.73.216.227).
Viewed 23 September 2026, 4:01 am.