Toshiba's Experiences of Geothermal Power Plant and Their Features
- Key words
- geothermal, power plant, steam turbine
- Conference
- World Geothermal Congress
- Year
- 2000
- Session
- Power Generation
- Language
- English
- Paper number
- R0747
Full text
627, opens in a new tab
Abstract
Toshiba has supplied and experienced long operations of several thousand kW to 110-120MW plants, thus we have now share of approx. 30% in total capacity of geothermal plants all over the world. The amount of total capacity of ToshibaĆs geothermal steam turbines has reached approx. 248MW with 7 units for Japanese domestic plants and more than 2556MW with 45 units for overseas plants. The recent Japanese domestic geothermal plants are represented by Uenotai plant(28.8MW) which is the first unit of a totally rationalized plant, Yanaizu-Nishiyama plant (65MW) applying parallel operation of gas extraction system by compressors and steam ejectors for high gas content, and Kakkonda No.2 plant (30MW) first applying a dry-wet cooling tower in Japan in order to prevent visual white exhaust moisture and icing of surrounding trees.
Copyright 2000, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.