Improving Geothermal Power Plant Performance with Topping and Bottoming Cycles, Case Histories in Iceland, New Xealand and the Philippines

Uri Kaplan and Daniel N. Schochet

Key words
Power Plants, Topping Cycles, Bottoming Cycles
Location
Svartsengi, Iceland; Kawerau, New Zealand; Taupo Volcanic Zone; Philippines; Leyte
Conference
World Geothermal Congress
Year
2000
Session
Case Histories
Language
English
Paper number
R0553

Full text

7766, opens in a new tab

Abstract

In many cases, additional generating capacity may be obtained in a cost effective manner by re-powering existing geothermal power plants utilizing otherwise-untapped geothermal energy, without drilling additional wells. Often this repowering also provides concommittant environmental benefits. This presentation examines several repowering applications, including the 9.1MW exhaust steam recovery binary power plant at Svartsengi in Iceland, the 6.4 MW brine recovery binary power plant at Kawerau in New Zealand and the Leyte geothermal power plant optimization project. The four (4) Leyte optimization plants added a total of 64 MW of geothermal power and improved environmental and power plant operating conditions, without any additional well field costs. With geothermal power plant owners and operators concerned with costs and competition, increasing plant output by re-powering is a highly desirable and cost effective option.

Copyright 2000, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.173 (216.73.217.173).
Viewed 22 September 2026, 10:55 pm.