Conference Papers Database New search

Five Years of Experience in the Operation of the Neustadt-Glewe Geothermal Project

Heiner Menzel, Peter Seibt and Torsten Kellner

Key words
geothermal energy, geothermal heating plant, thermal water
Location
Neustadt-Glewe, Germany
Conference
World Geothermal Congress
Year
2000
Session
Direct Use, Geothermal Heat Pumps
Language
English
Paper number
R0494

Full text

213, opens in a new tab

Abstract

A heat supply concept based on the use of geothermal energy was implemented in the town of Neustadt-Glewe. The Neustadt-Glewe geothermal project combines scientific research and investigations into the economic profitability and reliable supply. A capacity of 16.4 MWth is installed in the geothermal heating plant - including peripheral units - with 6.0 MWth referring to geothermal. Since 1995, the geothermal heating plant is in continuous operation. For improvement of the injectivity, soft acidising well treatment was carried out in 1998. Thanks to geothermal energy use, the emission of CO2 was reduced by about 3,000 tons in 1998. About 1.9 million m? of natural gas were saved.

Copyright 2000, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.173 (216.73.217.173).
Viewed 22 September 2026, 10:20 pm.