A Large-Scale Well Stimulation Campaign at Mahanagdong Geothermal Field (Tongonan), Philipines
- Key words
- geothermal well stimulation, acidizing, gas lifting, Mahanagdong, Tongonan, wellbore damage
- Location
- Mahanagdong, Philippines; Tongonan, Philippines; Leyte
- Conference
- World Geothermal Congress
- Year
- 2000
- Session
- Case Histories
- Language
- English
- Paper number
- R0483
Full text
290, opens in a new tab
Abstract
The Mahanagdong B production sector of the Greater Tongonan Geothermal Field was faced with a serious steam supply problem in the first half of 1997, with only 14 MWe available at the wellhead of seven production wells for a 60 MWe power plant. Significant thermal degradation of the resource brought about by extensive drilling prevented the discharge of most wells even with the aid of air compression and nitrogen gas lifting. Detailed analysis of reservoir and drilling data also revealed that all the wells had been muddamaged. The problem was compounded by the contractual obligation of PNOC-EDC to produce the 60 MWe equivalent of steam to the power plant by the middle of the year. A comprehensive well stimulation campaign was executed through which the situation was returned to a manageable level by June 1997. The strategy involved the simultaneous use of two coiled tubing units, one rig and two acidizing equipment spreads, all on one pad, to stimulate, discharge and commission the seven production wells in less than three months.
Copyright 2000, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.