Practical Experiences on Operating a Combined Geothermal Power Plant in Alaşehir Field
- Key words
- combined geothermal power plant, reservoir management, artificial lifting
- Conference
- Stanford Geothermal Workshop
- Year
- 2025
- Session
- Production Engineering
- Language
- English
- Paper number
- Aydin3
Full text
1287 KB, opens in a new tab
Abstract
Geothermal power plant operating conditions and efficiency are heavily influenced by the quality of the produced geothermal fluid, which is directly affected by changes in geothermal well performance and reservoir dynamics. The Alaşehir geothermal field, one of the most active fields in Türkiye, is operated by various geothermal developers. This study highlights the challenges encountered during 10 years of operation at a combined double-flash and binary geothermal power plant, with a focus on resource and power plant management. Solutions implemented include enhanced resource management strategies and operational improvements such as ESP installations, gas lifting, acidizing, booster pumps, and equipment upgrades. Modifications and adaptations were applied to critical components such as pumps, fans, heat exchangers, turbines, and other equipment in both the flashing and binary systems to maintain efficient and reliable operations.
Copyright 2025, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.