Practical Experiences on Operating a Combined Geothermal Power Plant in Alaşehir Field

Hakki AYDIN, Volkan KARAOGLAN, Ahmet YILMAZ, Arda EMRE, Huseyin GENCKAN

Key words
combined geothermal power plant, reservoir management, artificial lifting
Conference
Stanford Geothermal Workshop
Year
2025
Session
Production Engineering
Language
English
Paper number
Aydin3

Full text

1287 KB, opens in a new tab

Abstract

Geothermal power plant operating conditions and efficiency are heavily influenced by the quality of the produced geothermal fluid, which is directly affected by changes in geothermal well performance and reservoir dynamics. The Alaşehir geothermal field, one of the most active fields in Türkiye, is operated by various geothermal developers. This study highlights the challenges encountered during 10 years of operation at a combined double-flash and binary geothermal power plant, with a focus on resource and power plant management. Solutions implemented include enhanced resource management strategies and operational improvements such as ESP installations, gas lifting, acidizing, booster pumps, and equipment upgrades. Modifications and adaptations were applied to critical components such as pumps, fans, heat exchangers, turbines, and other equipment in both the flashing and binary systems to maintain efficient and reliable operations.

Copyright 2025, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.217.80 (216.73.217.80).
Viewed 22 September 2026, 7:41 am.