Conference Papers Database New search

A Method to Predict Production and Reinjection Capacity Changes Using Linked Wellbore and Reservoir Simulators

Enrique M. Lima Lobato, Hiroydu Tokita, Hideki Hatanaka

Conference
PNOC-EDC Geothermal Conference
Year
1998
Session
Reservoir Engineering
Language
English

Full text

269KB, opens in a new tab

Abstract

This paper describes a method to couple a wellbore simulator, a silica deposition simulator and a reservoir simulator. The method was designed to make use only of those variables in the three simulators which are common to the broblem of estimating the variation of production and reinjection rates as the reservoir pressure and enthalpy changes. The obtained method resulted independent of the characteristics of each simulators and is readily applicable for any of the available simulation packages. The coupling control is carried out by an external program written in Visual BasicTM while the interchange of information is carried out by an ExcelTM Sheet. Graphical presentations at the end of each time step are also carried out by the Excel Sheet. The method was tested utilising TOUGH2 (PC version) as the reservoir simulator, WellSimTM as the Wellbore Simulator and the SDRF as the Silica Deposition Rate Simulator.

Copyright 1998, PNOC-EDC. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.227 (216.73.216.227).
Viewed 23 September 2026, 3:32 am.