Conference Papers Database New search

Palinpinon 1 Geothermal Production Field Twenty Years Experience

Vicente D. Omandam, Jr.

Conference
PNOC-EDC Geothermal Conference
Year
2003
Session
Special Session: Palinpinon
Language
English

Full text

477KB, opens in a new tab

Abstract

Commercial exploitation of Palinpinon I Production Field started in 1983. Palinpinon I is located in the Southern Negros Geothermal Field in the island of Negros, Philippines and managed by the Philippine National Oil Company รป Energy Development Corporation. It supplies the steam that drives the 3 x 37.5 MWe turbine generator units of the state owned National Power Corporation.

During its twenty years of exploitation, the Palinpinon I Field has been continuously assessed, and problems observed are carefully studied. Problems encountered on well utilization to sustain the steam capability are discussed. Chemical, pressure, temperature, and flow monitoring had been proven to be important factors in optimizing the performance of the Palinpinon I Field.

The Zero Disposal System, which is integrated into the Fluid Collection and Recycling System, is also cited in this report. This method of geothermal fluid recycling and environmental protection is an improvement of early brine disposal practices.

Copyright 2003, PNOC-EDC. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.227 (216.73.216.227).
Viewed 23 September 2026, 1:05 am.