Conference Papers Database New search

Dieng Reservoir Numerical Model: A Robust Update

Marchel Christian SUPIJO, Ichwan Agusta ELFAJRIE, Zahratul KAMILA, ELFINA, Reza Jamil FAJRI, Julia Satriani ALIBAZAH, Aditya Yudha KENCANA, Muhammad Istiawan NURPRATAMA, Ali ASHAT

Key words
Dieng geothermal field, reservoir numerical model, TOUGH2
Conference
Stanford Geothermal Workshop
Year
2024
Session
Reservoir Engineering
Language
English
Paper number
Supijo

Full text

3096 KB, opens in a new tab

Abstract

PT Geo Dipa Energi (Persero) started developing Dieng Geothermal Field in 2002 with installed plant capacity of 60 MWe. Several Dieng numerical models have been developed in 2006, 2013, and 2019. The latest Dieng numerical model was built in 2019 as the basis of feasibility study for Dieng 2 development. With additional Dieng 2 wells data, comprehensive assessment of production and injection data of Dieng 1, and deep analysis of PT shut-in data, the updated numerical model is more robust than the previous model developed in 2019. Two reservoir compartments are considered in this model i.e. Sileri and Sikidang. The natural state and history matching for 20 years of Dieng 1 production indicated the extension (horizontally and vertically) of the steam cap distribution in Sileri area.

Copyright 2024, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.217.2 (216.73.217.2).
Viewed 24 September 2026, 9:41 pm.