Title:

Novel Coiled Tubing Operations in A Hostile Thermo-Chemical Environment

Authors:

Santiago ROCHA, Louis CAPUANO III, Louis CAPUANO Jr., David FAULDER, Patrick WALSH

Key Words:

Salton Sea, scale removal, workover, coiled tubing, open hole cleanout, hot mud motor, workover efficiency, high enthalpy reservoir, Hudson Ranch

Conference:

Stanford Geothermal Workshop

Year:

2023

Session:

Drilling

Language:

English

Paper Number:

Rocha

File Size:

1152 KB

View File:

Abstract:

The production wells at Hudson Ranch 1 produce a 600°F hypersaline brine from the Salton Sea geothermal reservoir. The produced brine is 25-30 wt% dissolved solids and is highly corrosive with a strong scaling potential. Wellbore scaling has been observed in the casing, at the flash depth, and where secondary fluids enter along the open hole. In the cased interval of the wells, cleaning out the accumulated wellbore scale and debris presents many different challenges due to variations in mechanical properties and configurations of the casing. In the open hole, production interval cleaning challenges are complicated by intervals of hole instability, and long open hole intervals necessary to reach the bottom production zones. Cleanouts using a coiled tubing (CT) unit are less than 20% of the cost of a cleanout using a drilling rig. Past operators have used CT with either a hydroblasting head or a downhole mud motor in either a static or flowing well, but always in the cased hole. Cyrq Energy, working with consultants, has performed groundbreaking cleanouts in the open hole of production and injection wells using all Metal Mud Motors (MMM), a technique here described as Hot Mud Motor (HMM) method, as the tool is run while the well is flowing with hot production brine. This paper discusses historical well cleanouts, root cause failure analysis, and risk assessment performed to achieve more than 10 CT cleanouts, some with over three thousand ft. of open hole through a fracture-dominated formation. The risk assessment includes the appropriate selection of CT size, workover technique, Bottom Hole Assembly (BHA), bit size selection, and operational parameters. These successful operations prove the effectiveness of CT and HMM at the Hudson Ranch project with careful planning, significant cost reduction compared to rig cleanouts, a reduction of mechanical risk, and increased operational safety.


ec2-3-137-178-133.us-east-2.compute.amazonaws.com, you have accessed 0 records today.

Press the Back button in your browser, or search again.

Copyright 2023, Stanford Geothermal Program: Readers who download papers from this site should honor the copyright of the original authors and may not copy or distribute the work further without the permission of the original publisher.


Attend the nwxt Stanford Geothermal Workshop, click here for details.

Accessed by: ec2-3-137-178-133.us-east-2.compute.amazonaws.com (3.137.178.133)
Accessed: Thursday 25th of April 2024 06:51:45 AM