Conference Papers Database New search

Modification of Wayang Windu Unit 1 Cooling Tower to Improve the CT Performance

Amri ZEIN

Key words
air flow, cooling tower, gearbox, modification, perfomance, recirculation, Star Energy, velocity
Conference
World Geothermal Congress
Year
2020
Session
Power Generation
Language
English
Paper number
26008

Full text

1444 KB, opens in a new tab

Abstract

Unit 1 Cooling Tower (CT) in Wayang Windu Geothermal Power Plant has been operating since 2000. There were excellent works had been conducted by Star Energy Geothermal (Wayang Windu) team in order to improve the CT performance while assuring the excellent CT operation reliability. The first project was replacing the CT fan stack with higher fan stack in 2011. The Unit 1 CT performance test revealed data of decreasing of approach temperature as much as 1.44°C, increasing of range temperature as much as 1.92°C, and increasing of CT effectiveness as much as 5.17%. The impact was equivalent to net generation improvement of 1.44 MW. The second project was replacing the existing low reliable CT gearbox with more reliable gearbox and the increasing number of fan blades to improve the CT performance during CT upgrading project from 2014 till 2017. The CT upgrading project improved the CT thermal performance and the impact was equivalent to net generation improvement of 0.40 MW.

Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 25 September 2026, 7:47 am.