A Review of Geothermal Pricing Policy and Its Impacts on Geothermal Development in Indonesia
- Key words
- Price, Pricing Policy, Geothermal Development, Indonesia
- Conference
- World Geothermal Congress
- Year
- 2020
- Session
- Policy, Legal and Regulatory Aspects
- Language
- English
- Paper number
- 03016
Full text
1085 KB, opens in a new tab
Abstract
Geothermal power development in Indonesia has been started in the early 1910s to 1970s where numbers of geoscientific explorations and shallow exploration drilling had taken place in Kamojang. Geothermal Power Plant Kamojang Unit 1 with the generation capacity of 30 MW is the first Geothermal Power Plant in Indonesia which has been operated commercially since 1982 and it has been successfully maintain operations for around 40 years. It has contributed to total of installed geothermal power plants in Indonesia which amounts to 1948.5 MW. Geothermal development in Indonesia, based on issuance of Geothermal Law, can be divided into 2 periods, namely before and after the issuance of the Geothermal Law. Since the issuance of the Geothermal Law in 2003, Government has been fully in charge of regulating geothermal enterprising which was previously undertaken by PERTAMINA. Furthermore, in order to accelerate geothermal development, the Government issued various regulations and policies, one of which was the policy on geothermal pricing. Until now, the government has issued 7 policies on geothermal prices through Ministerial of Energy and Mineral Resources Regulation. This paper will discuss each of these pricing policies in detailed and evaluates the impact of each of these policies on geothermal development in Indonesia
Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.