Conference Papers Database New search

Coiled Tubing Live Well Cleanouts

Daniel WILSON, Josh ANDERSON

Key words
calcite scaling, slica scaling, workover, Contact Energy, Wairakei, Western Energy, live well cleanout, coiled tubing
Conference
World Geothermal Congress
Year
2020
Session
Drilling and Completion Technology
Language
English
Paper number
21041

Full text

1177 KB, opens in a new tab

Abstract

Contact Energy Limited (CEL) with their partners Western Energy Services (WES) in New Zealand have been pioneering live well cleanouts on production wells and reinjection wells. The most obvious advantage of live well cleanouts is very minimal production (or reinjection) down-time, and other advantages in production wells include avoiding thermal cycling of the casing and removing the wellbore scale fragments to the surface which prevents blocking the reservoir. In 2018 CEL successfully cleaned out 1 reinjection and 6 production wells, and gained back 34.3MWe of generation at only a fraction of the cost of a traditional rig workover. Since inception CEL and WES have cleaned out a total of 30 wells (3 reinjection wells and 27 production) at several geothermal fields. CEL and WES are continuously developing the method and pushing the boundaries on what can be achieved. Initial concepts for using coiled tubing in geothermal wells were developed from oil and gas technology which was then adapted to suit the harsh geothermal environment. In this environment, the highly destructive high-temperature geothermal fluid proved to be the biggest hurdle for job design and tool suitability. Our team first selected a variable vane style mud motor to power a milling bit to mechanically remove the scale from the wellbore. Although successful in multiple wells with apparent soft scale, the limited motor life resulted in poor performance for harder scale and extended milling section operations. Despite an initial success rate of less than fifty percent over the first five attempts, both CEL and WES retained a clear appetite for innovation, fuelling a path to broader thinking and design alterations that has led to recent successes. Trials on multiple candidate wells have demonstrated the suitability of coiled tubing for this purpose. Through pushing of traditional boundaries this technology continues to evolve as a trusted and reliable method to remove scale in geothermal wells. The technology has been utilized to clean out production and reinjection wells to a diameter of 14.5” ID (16” casing) and depths of up to 3000m.

Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 2 October 2026, 4:23 pm.