Þeistareykir Geothermal Power Plant – Deposits in Gas Removal System

Asgerdur K. SIGURDARDOTTIR, Trausti HAUKSSON, Jan PRIKRYL, Karl Emil SVEINSSON

Key words
Selenium deposits, gas removal system, corrosion.
Conference
World Geothermal Congress
Year
2020
Session
Case Histories
Language
English
Paper number
06050

Full text

1072 KB, opens in a new tab

Abstract

The National Power Company of Iceland, Landsvirkjun, has completed the construction of the Þeistareykir 90 MW geothermal power plant. Þeistareykir is in NE Iceland, 27 km SE of the town Húsavík. The power plant has been in full operation since April 2018. When operating a new geothermal Power plant, one might bump onto varies of problems that are found to a lesser or greater degree at every site depending on the geology, reservoir conditions and chemical compositions. After only few months operating condensate pumps in the gas removal system of Þeistareykir geothermal power plant started failing, closer inspection showed red-brownish deposits. Inspected deposits samples turned out to be mostly sulphur (S), selenium (Se), and partly oxygen (O) enriched products. Selenium and sulphur originating from volcanic activity as it is volatilized and transferred to the environment during volcanic activity. Later, expansions joint in the gas removal system started leaking because of corrosion, the reason being moisture and oxidizing conditions forming sulfuric (H2SO4) and selenic acid (H2SeO4)

Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 27 September 2026, 1:40 pm.