Production-Injection at the Costa Rica Geothermal Fields 1994 – 2019: Dr. Alfredo Mainieri Protti (Formerly Miravalles) and Pailas
- Key words
- Production, injection, Dr. Alfredo Mainieri Protti, Miravalles, Pailas, Costa Rica
- Conference
- World Geothermal Congress
- Year
- 2020
- Session
- Production Engineering, Steam Gathering Systems
- Language
- English
- Paper number
- 25026
Full text
4049 KB, opens in a new tab
Abstract
The electricity capacity (from the geothermal resource) installed in Costa Rica is approximately 215 MWe in 2018, increased to 270 MWe with the Pailas II Unit by 2019. There are four steam units installed in Dr. Alfredo Mainieri Protti Geothermal Field (formerly Miravalles Geothermal Field): Unit 1 (55 MWe, although it can reach 60 MWe, 1994), Wellhead Unit (5 MWe, 1995), Unit 2 (55 MWe, although it can reach 60 MWe, 1998) and Unit 3 (29 MWe, 2000), and also a binary plant: Unit 5 (19 MWe, 2004). Pailas has a binary unit with a production of 42 MWe installed (2011). However, the commercial production of the second unit (Pailas II Unit, steam unit) begins in 2019, with a contribution of about 55 MWe. The Dr. Alfredo Mainieri Protti field has supplied the steam and brine needed to generate over twenty four years of exploitation (1994-2018), while Pailas field (Unit I) has approximately seven years of operation, with changes in the configuration of wells. The performance of the fields and changes in strategies, in terms of production-injection, are described in the following sections.
Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.