Conference Papers Database New search

Tiwi Geothermal Field: Reservoir Management After 40 Years of Commercial Operation

Arnel MEJORADA, Joy TOLENTINO, Ronald VICEDO

Key words
Tiwi Geothermal field, reservoir management, injection strategy, deep drilling
Conference
World Geothermal Congress
Year
2020
Session
Case Histories
Language
English
Paper number
06059

Full text

1211 KB, opens in a new tab

Abstract

The Tiwi Geothermal Field in Albay, Philippines is operated by Philippine Geothermal Production Company Inc. (PGPC). It began commercial operations in 1979 (Menzies et al, 2010a), initially with shallow production well drilling concentrated in the Naglagbong sector in the eastern part of the current production area. After a steep drop in productivity of the first wells due to the impact of entry of meteoric recharge into the reservoir, three other geographic sectors were developed for production starting in the late 1980s. These were the Kapipihan sector in the center and south, Matalibong sector in the northwest, and the Bariis sector in the southwest. Up until the mid-1990s, steam availability was maintained through drilling of new production wells across these new production sectors to support the 330 MW installed capacity of the power plants. Through the years, multiple challenges were managed through various technical and operational initiatives and from these experiences, improvements in the understanding of the reservoir contributed to the development of the current reservoir management strategy in order to increase and maintain steam supply. To recover steam production, drilling deep into the postulated upflow zones in the Bariis and South Kapipihan sectors aims to harness the deep liquid production zones, while casing deep isolates the well from the intrusion of acidic fluids found near the top of the liquid-dominated reservoir in some sectors. For existing wells, executing timely and appropriate well work options improves steam availability. On brine disposal, hot brine systems have proven much more reliable compared with cold brine systems and by utilizing idle wells, injection capacity shortfalls have been averted. At the same time, managing injection loads at different injection sectors should ensure adequate mass recharge with minimal thermal breakthrough, resulting to continued steam generation for years to come.

Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 25 September 2026, 1:17 am.