Thermodynamic Cycle of the Maibarara Geothermal Field, Philippines
- Key words
- Maibarara, thermodynamic cycle, pressure-enthalpy diagram, exergy
- Conference
- World Geothermal Congress
- Year
- 2020
- Session
- Field Management
- Language
- English
- Paper number
- 24001
Full text
4711 KB, opens in a new tab
Abstract
The Maibarara Geothermal Field has been in commercial operation since February 2014 commencing with 20-MW generation. In April 2018, an additional 12-MW facility was completed providing total installed capacity of 32 MW for the field. The thermodynamic cycle of the geothermal field including its energy facilities was analyzed using pressure-enthalpy diagram. Geochemical data and tracer flow testing results were the references used for thermodynamic analysis. The thermodynamic cycle provides a better understanding and holistic view of how the Maibarara production system works, especially on fluid transport from the reservoir to surface facilities.
Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.