Geothermal Corrosion Case Studies at the Wairakei and Broadlands Geothermal Fields Using the Corrosometer Method
- Conference
- New Zealand Geothermal Workshop
- Year
- 1980
- Session
- Corrosion
- Language
- English
Full text
209KB, opens in a new tab
Abstract
Instantaneous and continuous corrosion rates can be monitored by a 'Corrosometer' method. This method can readily be adapted to solve problems on corrosion in geothermal fluids. In this paper, a variety of geothermal case studies are presented, demonstrating the value of this rapid corrosion assessment. These include a study of the effect of pressure on corrosion rate in some geothermal fluids at Broadlands, an investigation of rapidly corroding bleed pipes and connections at Broadlands well BR 32, a study of the effects of geothermal steam condensate velocity on the corrosion rate of mild steel at Wairakei, and corrosion inhibitor monitoring of high pressure steam transmission lines at Wairakei.
Copyright 1980, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.