Conference Papers Database New search

Geothermal Power Generation in the World 2015-2020 Update Report

Gerald HUTTRER

Key words
World, geothermal, electricity generation, country update, development
Conference
World Geothermal Congress
Year
2020
Session
Country Updates
Language
English
Paper number
01017

Full text

1015 KB, opens in a new tab

Abstract

We have analyzed the major activities carried out for generation of geothermal electricity since WGC 2015. New data has been taken from the WGC 2020 Country Update reports, private communications from IGA members, and affiliated organizations. The author would like to acknowledge all of these data sources for their valuable help. Other updates have been collected from websites of private and public organizations involved in geothermal development as well as via personal communications. Plants under construction which are expected to be commissioned in 2020 are included in the installed capacity. An increase of about 3.649 GW has been achieved (about 27%) in the five year term 2015-2020. This figure deviates only slightly from the roughly linear increase trend documented since 2010. Five countries generated geothermal power for the first time. They are Belgium (0.8 MWe), Chile (48 MWe), Croatia (16.5 MWe), Honduras (35 MWe), and Hungary (3 MWe).

Copyright 2020, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.23 (216.73.217.23).
Viewed 22 September 2026, 1:43 am.