Resource Evaluation and Development Plans for 120 MW Geothermal Power Plant on Milos Island, Greece.
- Location
- Milos, Greece
- Conference
- New Zealand Geothermal Workshop
- Year
- 1983
- Session
- Reservoir Assessment
- Language
- English
Full text
688KB, opens in a new tab
Abstract
Five deep have been on Island of Greece, identifying a high - temperature, high - enthalpy reservoir. The thermodynamic properties of the and the porosity and of the formation a and heat storage capacity that support a 60 power for 85 years a 120 for half that time. The existing five can deliver 180 t/h of steam at 10 bar ab's pressure, of. generating a maximum power output of than 20 This paper describes the and the testing pertaining to the five and discusses the potentia 9 for a 60 geothermal power plant.
Copyright 1983, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.