Full Coring Drilling Operation Analysis to Improve the Exploration Drilling Performance of Geothermal Slimhole
- Key words
- Full coring rig, slimhole, geothermal, drilling, Indonesia
- Conference
- Stanford Geothermal Workshop
- Year
- 2021
- Session
- Drilling
- Language
- English
- Paper number
- Rachmadani
Full text
1073 KB, opens in a new tab
Abstract
Exploration phase comes with an objective to prove the presence of a geothermal system underneath the earth surface. The resource proving process can only be confirmed by conducting drilling activity. Several alternative well sizes that are known in geothermal industry are Big Hole, Standard Hole, and Slimhole. Drilling rigs used in slimhole drilling are generally designed in advance to have coring abilities. As we know, the use of a full (mineral) coring rig is usually only done for mining activities. Full Coring, is a drilling technique that is carried out to the planned depth by taking samples in the form of rock cores without open hole drilling. This is what makes the full coring rig can be adaptable for slimhole rig and optimizes the mineral coring drilling performance in X field. This paper also aims to determine the ROP (m/hr) for drilling duration estimation. The analysis of drilling performance is based on the daily drilling reports of Rig X (full coring rig with NQ depth rating of 2,000 m). The offset wells to be analyzed are X-1 well, X-2 well, and X-3 well.
Copyright 2021, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.