Conference Papers Database New search

Use of Ice Plugs in Geothermal Anti-Scalant Tubing Systems

W. Duran, B. Drew, G. Earl and N. Cumare

Key words
anti-scalant tubing, geothermal, chemical injection, scale formation, ice plugs
Conference
New Zealand Geothermal Workshop
Year
2020
Language
English
Paper number
75

Full text

383KB, opens in a new tab

Abstract

Anti-scalant tubing is commonly used in geothermal wells to allow chemical injection of anti-scalant fluids from the surface, delaying scale formation downhole. This tubing is intended to be continuously exposed to severe well conditions creating a need for monitoring and inspecting the injection string periodically. One of the methods used to inspect the tubing is called tubing lift. This consists of retrieving part of the anti-scalant tubing string from the well. This procedure moves the localised stress point on the tubing string and also allows inspection of part of the anti-scalant tubing at the surface.
Over time, this excess tubing collected at the surface becomes problematic, taking up space at the wellhead, and needs to be removed. A common solution to this problem is to cut and re-join the tubing with the slack removed. Unfortunately, this process has the inherent risk that when the tubing is cut, for a short period, the well remains open to the atmosphere. To avoid this exposure, the alternative is to retrieve the entire tubing string followed by unspooling & spooling, cutting and re-running the string in the well. However, this is a timely and costly endeavour for such a small change in the anti-scalant tubing string.
To improve the cut and re-join process, the idea of a temporary well barrier was explored, and ice plugs were found to be a suitable solution to well containment. Ice plugs have been used in process industries in a variety of applications, but there currently exists no documented evidence of their use in geothermal anti-scalant tubing maintenance.
This paper discusses the use of ice plugs in geothermal anti-scalant tubing operations, and how they have provided a simple and inexpensive solution in contrast to a full tubing retrieval while still addressing the well control risk of the cut and re-join method.

Copyright 2020, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.227 (216.73.216.227).
Viewed 23 September 2026, 12:08 pm.